Maintenance log - 05/03/2026

March 5, 2026

4075km since last full service (Birmingham, October 2025)

Clean & visual inspection

Bolt / torque check

S&S coupling check

Spoke tension check

Tyre and sealant check

  • Swapped tyres front to rear to even out wear (new Orange Seal Endurance sealant all round)

Brake check

  • Front rotors and pads replaced on both bikes
  • Beck’s rear rotor and pads replaced (Sam’s rear rotor was replaced ~3000km ago)
  • Burped Beck’s rear brake (test…may need bleeding)

Check for play (BB / hubs etc)

Move EBB and seat post

Other tweaks

  • Properly tightened Sam’s mini Rohloff bolt by taking rear rotor off
  • Fitted Sam’s new saddle 🤞🏼

Notes for next time

  • Rohloff oil change in Laayoune
  • Fetch spare tyre from bike shop in Tan-Tan

Thanks to this chap for lending me his cassette lock ring tool to remove and refit our new front rotors.

Young guy in a bike workshop with loads of bikes outside. Sign a over workshop reads: Bike No
CommentsNo comments yet. Be the first to comment!
Leave a comment

Keep up, get in touch.

Bimbling By Bike Newsletter

Bimbling By Bike